- a) Mechanical servicing of VCB mechanism (manual close, trip and electrical close trip). Visual inspection of all parts. Servicing like cleaning, lubrication. Spares supplied and fixed if required.
- b) Spring charging (manual or electrical motor).
- c) Checking of control wirings.
- d) Overall insulation value (megger value) test.
Tests for Circuit Breakers, Transformers, and Relays include:
- a) Circuit Breaker (VCB closed and open), CT/PT Insulation Resistance Measurement using a 5KVA/230V DG set (Megger).
- b) Operational Checks: draw-out mechanism, spring charging, interlocks, Earth switch operation.
- c) Over Current Earth Fault Relay Primary Injection Testing.
- d) Primary Injection Test of Potential & Metering cores.
'Retrofitting' upgrades technology without replacing the entire switchgear. It avoids modifications in foundation, cable routes, and requires no massive shutdown.
* CASETTE-TYPE DRAW-OUT UNIT offered with complete safety interlocks.
Every four months, a mandatory visit is made by JES to examine every breaker. In addition, emergency call-based visits are prioritized and executed rapidly.
We hold spares and technical expertise for all major makes including Siemens, ABB, Areva, L&T, CGL, BHEL, Easun, S&S, Jyoti, Biecco Lawrie, and System Control.
Our service charges are highly competitive. Our motto is the best service.